| Permit | Form: (02) 400571934 04/02/2014 | Open hole resistivity and gamma logs shall be run to describe the stratigraphy of the entire well bore and to adequately verify the setting depth of surface casing and aquifer coverage. On a multi-well pad, these open hole logs are only required on one of the first wells drilled on the pad and the Drilling Completion Report - Form 5 for every well on the pad shall identify which well was logged.
|
| Permit | Form: (02) 400571934 04/02/2014 | Operator shall comply with Buffer Zone Move-In, Rig-Up Notice Policy dated 12-16-2013.
|
| Engineer | Form: (02) 400571934 04/14/2014 | Operator acknowledges the proximity of the listed non-producing well. Operator agrees to provide mitigation Option 3 (per the DJ Basin Horizontal Offset Policy), ensure all applicable documentation is submitted, and submit Form 42(s) (“OFFSET MITIGATION COMPLETED”) for the remediated well, referencing the API Number of the proposed horizontal well(s) stating what appropriate mitigation occurred and that it has been completed, prior to the hydraulic stimulation of this well.
Long-Altex (API# 123-11301) |
| Engineer | Form: (02) 400571934 04/14/2014 | 1) Submit Form 42 electronically to COGCC 48 hours prior to MIRU.
2) Comply with Rule 317.i and provide cement coverage from end of 7” casing to a minimum of 200' above Niobrara. Verify coverage with cement bond log.
3) Comply with Rule 321. Run and submit Directional Survey from TD to base of surface casing. Ensure that the wellbore complies with setback requirements in commission orders or rules prior to producing the well.
|
| Engineer | Form: (02) 400978864 06/13/2016 | Bradenhead tests shall be performed on all wells on this pad on the following schedule:
1) Within 60 days of rig release and prior to stimulation (wells already stimulated excepted).
2) Between 6 and 7 months after rig release or prior to stimulation.
3) Within 30 days of First Production as reported on Form 5A (wells already producing shall be tested within 30 days).
Test results shall be submitted on Form 17 within 10 days of test. |
| Engineer | Form: (02) 400978864 06/13/2016 | Note surface casing setting depth change from 1250’ to 1500’. Increase cement coverage accordingly and cement to surface |
| Engineer | Form: (02) 400978864 06/13/2016 | 1) Submit Form 42 electronically to COGCC 48 hours prior to MIRU for the first well activity with a rig on the pad and provide 48 hour spud notice for each subsequent well drilled on the pad.
2) Comply with Rule 317.j and provide cement coverage from TD to a minimum of 200' above the Niobrara. Verify coverage with cement bond log.
3) Oil based drilling fluid is to be used only after all aquifers are covered. |
| Permit | Form: (02) 400978864 06/22/2016 | Approval of this refile APD does not provide relief from compliance with the COGCC Reclamation Rules.
|
| Permit | Form: (02) 400978864 08/15/2016 | This Permit to Drill is approved subject to all the BMPs and COAs on the most recently approved Form 2A and any subsequently approved Form 4 for the Oil and Gas Location (Location ID #333035). The most recently approved Form 2A and any subsequent Form 4s containing applicable COAs for this location shall be posted onsite during construction, drilling, and completions operations |
| Permit | Form: (04) 402202056 11/04/2019 | This Sundry Notice Form 4 authorizes changes in the drilling/casing/cementing program as shown on the Drilling Permit Form 2 and must be visibly posted with the permit during drilling.
|
| Permit | Form: (04) 402202056 11/04/2019 | Drilling Beyond the Unit Boundary Setback: Operator will ensure the wellbore beyond the unit boundary setback is physically isolated and is not completed. In the Operator Comments on the Form 5A the operator will (1) report the footages from the section lines of the bottom of the completed interval, (2) describe how the wellbore beyond the unit boundary setback is physically isolated, and (3) certify that none of the wellbore beyond the setback was completed. |
| Engineer | Form: (04) 403477674 07/28/2023 | At the conclusion of the nine months (4/28/2024), conduct a new Bradenhead test and submit the Form 17 within ten days of the test and submit a Form 4 Sundry that summarizes current well condition. The sundry should include details of the future plans and the flow rate information and pressure data. |
| Engineer | Form: (04) 403477674 07/28/2023 | Shut in Bradenhead pressure shall not exceed 50 psig. |
| Engineer | Form: (04) 403726206 04/05/2024 | At the conclusion of twelve months (4/05/2025), conduct a new Bradenhead test and submit the Form 17 within ten days of the test and submit a Form 4 Sundry that summarizes current well condition. The sundry should include details of the future plans and the flow rate information and pressure data. |
| Engineer | Form: (04) 403726206 04/05/2024 | Shut in Bradenhead pressure shall not exceed 50 psig.
|
| Engineer | Form: (04) 404139009 04/01/2025 | At the conclusion of six months (10/05/2025), conduct a new Bradenhead test and submit the Form 17 within ten days of the test and submit a Form 4 Sundry that summarizes current well condition. The sundry should include details of the future plans and the flow rate information and pressure data. |
| Engineer | Form: (04) 404139009 04/01/2025 | Shut in Bradenhead pressure shall not exceed 50 psig.
|
| Engineer | Form: (04) 404407994 10/28/2025 | At the conclusion of six months (04/02/2026), conduct a new Bradenhead test and submit the Form 17 within ten days of the test and submit a Form 4 Sundry that summarizes current well condition. The sundry should include details of the future plans and the flow rate information and pressure data. |
| Engineer | Form: (04) 404407994 10/28/2025 | Shut in Bradenhead pressure shall not exceed 50 psig. |
| Engineer | Form: (04) 404575675 03/12/2026 | At the conclusion of twelve months (02/11/2027), conduct a new Bradenhead test and submit the Form 17 within ten days of the test and submit a Form 4 Sundry that summarizes current well condition. The sundry should include details of the future plans and the flow rate information and pressure data. |
| Engineer | Form: (04) 404575675 03/12/2026 | Shut in Bradenhead pressure shall not exceed 50 psig.
|