| Engineer | Form: (02) 400421032 07/03/2013 | 1) Provide 48 hour notice prior to spud via electronic Form 42.
2) Provide cement coverage to a minimum of 200' above Niobrara. Verify coverage with cement bond log.
3) Run and submit Directional Survey from TD to base of surface casing. Ensure that the wellbore complies with setback requirements in commission orders or rules prior to producing the well.
|
| Permit | Form: (02) 400421032 07/05/2013 | Operator must meet water well testing requirements per Rule 318A. |
| Engineer | Form: (04) 403705516 03/07/2024 | If not returned to production by 3/7/25 operator will perform an MIT. |