COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
EngineerForm: (02)
400412680
05/07/2013
1)Provide notice of MIRU via an electronic Form 42. 2)Comply with Rule 317.i and provide cement coverage to a minimum of 200' above the Niobrara and from 200’ below Sussex to 200’ above Sussex. Verify cement coverage with a cement bond log per 317.o.
PermitForm: (02)
400412680
05/20/2013
Operator must meet Water Well Testing requirements as per amended Rule 318Ae(4)
EngineerForm: (04)
403185589
11/04/2022
1) Provide electronic Form 42 Notice of MIRU 2 business days ahead of operations. 2) Operator shall implement measures to control venting, to protect health and safety, and to ensure that vapors and odors from well plugging operations do not constitute a nuisance or hazard to public welfare.
 
COGIS - Best Management Practice Results
BMP TypeSource DocumentBest Management Practices
Drilling/Completion OperationsForm: (02 )
400412680
5/30/2013
Prior to drilling operations, Operator may perform an anti-collision review of existing offset wells that have the potential of being within close proximity of the proposed well. This anti-collision review may include MWD or gyro surveys and surface locations of the offset wells with included error of uncertainty per survey instrument, and compared against the proposed wellpath with its respective error of uncertainty. If current surveys do not exist for the offset wells, Operator may have gyro surveys conducted to verify bottomhole location. The proposed well may only be drilled if the anti-collision review results indicate that the risk of collision is sufficiently low as defined by the anti-collision plan, with separation factors greater than 1.5, or if the risk of collision has been mitigated through other means including shutting in wells, plugging wells, increased drilling fluid in the event of lost returns or as is appropriate for the specific situation. In the event of an increased risk of collision, that risk will be mitigated to prevent harm to people, the environment or property. For the proposed well, upon conclusion of drilling operations, an as-constructed directional survey will be submitted to COGCC with the Form 5. At the time of permitting, the operator has identified the following well(s) as being within close proximity of the proposed wells: BLUFFS WHITE W 5-1, BLUFFS WHITE W 5-8, RAINE 1-5A, BLUFFS 8-5A, KUNZMAN W 05-09
Drilling/Completion OperationsForm: (02 )
400412680
5/30/2013
Kerr McGee acknowledges and will comply with the COGCC Policy for Bradenhead Monitoring during Hydraulic Fracturing Treatments in the Greater Wattenberg Area dated May 29, 2012.
PlanningForm: (04 )
403185589
11/4/2022
Operations are daylight-only; no lighting impacts are anticipated from operations.
Community Outreach and NotificationForm: (04 )
403185589
11/4/2022
Courtesy notifications will be sent to all parcel owners with building units within 1,500 feet of the location letting them know about our subsequent well operations and providing contact information for Kerr McGee’s response line and online resources.
Community Outreach and NotificationForm: (04 )
403185589
11/4/2022
Signs will be placed in conspicuous locations and will include Oxy contact information; the Oxy Stakeholder Relations team will respond to all community member inquiries. The signs will be placed so as not to create a potential traffic hazar
WildlifeForm: (04 )
403185589
11/4/2022
This location was reviewed using a desktop method to review publicly available wildlife data (including CPW & COGCC data) as well as internal wildlife datasets and aerial imagery. No risks were identified. All field personal are trained to identify wildlife risks and raise concerns noticed during operations with the Health, Safety, and Environment (HSE) department.
Dust controlForm: (04 )
403185589
11/4/2022
Water will be placed on dirt access roads to mitigate dust as needed.
Noise mitigationForm: (04 )
403185589
11/4/2022
Operations will be in compliance with Table 423-1 requirements. Based off the rig sound signature, rig orientation will be considered to reduce noise levels to nearby building units.