Skip to Main Content

COGIS DB

 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation IDRelated Facilities
WELL05-123-36956Waste Management
2L-201
PDC ENERGY INC
69175
SI
2/1/2024
WATTENBERG
90750
WELD  123
SWSW 2 2N64W 6
432119View Related
 
COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
EngineerForm: (02 )
400376448
2/19/2013
1) Provide 48 hour notice of spud via electronic Form 42. 2) Set at least 900’ of surface casing. Cement to surface. 3) Provide cement coverage to a minimum of 200' above Niobrara. Verify coverage with cement bond log. 4) Run and submit Directional Survey from TD to base of surface casing. Ensure that the wellbore complies with setback requirements in commission orders or rules prior to producing the well.
 
COGIS - Best Management Practice Results
No records to display.