| Engineer | Form: (02) 400354940 01/15/2013 | 1)Provide notice of MIRU via an electronic Form 42.
2)Comply with Rule 317.i and provide cement coverage to a minimum of 200' above the Niobrara. Verify cement coverage with a cement bond log per 317.o.
|
| Engineer | Form: (02) 400354940 01/15/2013 | Kerr McGee acknowledges the proximity of Nobel’s well Cannon Red W #3-4D API# 123-16278 to Kerr McGee’s proposed well the Cannon 16C-3HZ (doc #400354743) and Cannon 16N-3HZ (doc# 400354940). Kerr McGee shall undertake necessary mitigation measures to prevent groundwater contamination from the above identified offset wells in the drilling and completion of proposed well. Through review of the APD, should Commission staff identify offset wells that raise reasonable concerns related to any offset well(s)’ wellbore integrity’s ability to preserve formation isolation, but which are not owned or operated by Kerr McGee, Kerr McGee shall notify and use best efforts to work with the offset well operator(s) for purposes of implementing necessary mitigation measures to minimize risk of groundwater contamination. |
| Permit | Form: (02) 400354940 01/18/2013 | Operator must meet water well testing requirements per Rule 318A.
|
| Engineer | Form: (04) 400587307 04/09/2014 | Please submit form 17 for previous tests and after each new test. |
| Engineer | Form: (04) 402480883 09/08/2020 | Operator shall continue to monitor pressure, and report to COGCC through annual test reporting.
|
| Engineer | Form: (04) 403017653 04/27/2022 | Operator shall continue to monitor pressure, and report to COGCC through annual testing. If monitored well conditions meet the thresholds defined by Order 1-232 a new bradenhead test and sundry must be filed.
|