Engineer | Form: (02 ) 400325349 9/18/2012 | 1)Provide notice of MIRU via an electronic Form 42.
2)Comply with Rule 317.i and provide cement coverage from the 7” casing TD to a minimum of 200' above the Niobrara and from 200’ below Sussex to 200’ above Sussex. Verify coverage with a cement bond log.
|
Engineer | Form: (02 ) 400325349 9/18/2012 | Stimulation of this well may not take place until: the Plugging and Abandonment work (or other remediation approved by the COGCC) takes place for the Jerald L Stugart Unit #2 (API# 123-09900) well, this work is captured on the appropriate report (i.e. Form 6 Subsequent Report of Abandonment), and that report is submitted to and approved by the COGCC. |
Permit | Form: (02 ) 400325349 9/21/2012 | Operator must meet water well testing requirements per Rule 318A.
|
Engineer | Form: (04 ) 402636387 4/5/2021 | Operator shall continue to monitor pressure, and report to COGCC through annual testing. If monitored well conditions meet the thresholds defined by Order 1-232 a new bradenhead sundry must be filed.
|
Engineer | Form: (04 ) 402636387 4/5/2021 | If bradenhead pressures return, collect bradenhead and production gas samples for laboratory analysis. Sampling will comply with Operator Guidance - Bradenhead Testing and Reporting Instructions, Appendix A: Liquid and Gas Sampling. Copies of all final laboratory analytical results will be provided to the COGCC within three months of collecting the samples
|