| Permit | Form: (02) 400298211 07/16/2012 | Operator must meet water well testing requirements per Rule 318A.
|
| Engineer | Form: (02) 400298211 07/25/2012 | 1)Provide notice of MIRU via an electronic Form 42.
2)Comply with Rule 317.i and provide cement coverage from the end of the production casing to a minimum of 200' above the Niobrara. Verify coverage with a cement bond log.
|
| Engineer | Form: (04) 402075582 07/11/2019 | 1. Operator shall implement measures to control venting, to protect health and safety,
and to ensure that vapors and odors from well operations do not constitute a nuisance
or hazard to public welfare.
2. Prior to starting bradenhead abatement, collect bradenhead and production gas
samples for laboratory analysis. Sampling shall comply with Operator Guidance -
Bradenhead Testing and Reporting Instructions, Appendix A: Liquid and Gas Sampling.
Copies of all final laboratory analytical results shall be provided to the COGCC within
three months of collecting the samples.
3. Bradenhead gas is not to be vented to atmosphere; any gas from the Bradenhead
will be routed to an enclosed tank and/or combustor. Operator should measure the gas
flow to get an estimate of the gas flow from the bradenhead. The abatement program
may be used for six months. At the conclusion of the six months, submit a Sundry that
summarizes current well condition and includes the flow rate information and pressure
data. |
| Engineer | Form: (04) 403614207 12/18/2023 | Operator shall continue to monitor pressure, and report to ECMC through annual testing. If monitored well conditions meet the thresholds defined by Order 1-232 a new bradenhead test and sundry must be filed.
|