| Permit | Form: (02) 400275944 06/29/2012 | Operator must comply with COGCC Policy for Bradenhead Monitoring During Hydraulic Fracturing Treatments in the Greater Wattenberg Area dated May 29, 2012.
|
| Permit | Form: (02) 400275944 06/29/2012 | Operator shall run an open hole log across the surface casing shoe on the first well drilled from this pad. |
| Engineer | Form: (02) 400275944 06/29/2012 | 1)Provide notice of MIRU via an electronic Form 42.
2)Comply with Rule 317.i and provide cement coverage from the end of the production casing to a minimum of 200' above the Niobrara. Verify coverage with a cement bond log.
|
| Engineer | Form: (04) 402480868 09/08/2020 | Operator shall continue to monitor pressure, and report to COGCC through annual test reporting.
|
| Engineer | Form: (04) 403017621 04/26/2022 | Operator shall continue to monitor pressure, and report to COGCC through annual testing. If monitored well conditions meet the thresholds defined by Order 1-232 a new bradenhead test and sundry must be filed.
|