Permit | Form: (02 ) 400154309 2/29/2012 | Well head is 170 feet drom a public road; derrick height (ground to crown) cannot exceed 113 feet. |
Permit | Form: (02 ) 400154309 2/29/2012 | Operator must meet water well sampling requirements as per Rule 318A. |
Engineer | Form: (02 ) 400154309 3/12/2012 | 1) Provide 48 hour notice of MIRU to John Montoya by e-mail at John.Montoya@state.co.us. Indicate Spud Notice in the subject line and provide the following information: Operator Name, Well Name and Number, API #, Spud Date, Contact Name, Contact Phone #, Email Address. Submit Form 42 electronically after April 1 for spud notice.
2) Provide cement coverage from TD to a minimum of 200' above Niobrara. Verify coverage with cement bond log.
3) Run and submit Directional Survey from TD to base of surface casing. Ensure that the wellbore complies with setback requirements in commission orders or rules prior to producing the well.
|