WELL05-123-35244Antelope
M-29
BONANZA CREEK ENERGY OPERATING COMPANY LLC
8960
TA
10/7/2019
WATTENBERG
90750
WELD  123
NESW 29 5N62W 6
422173View Related
 
COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
PermitForm: (02 )
400241058
2/14/2012
Operator must meet water well sampling requirements as per Rule 318A.
EngineerForm: (02 )
400241058
3/1/2012
1) Provide 48 hour notice of MIRU to John Montoya by e-mail at John.Montoya@state.co.us. Indicate Spud Notice in the subject line and provide the following information: Operator Name, Well Name and Number, API #, Spud Date, Contact Name, Contact Phone #, Email Address. Submit Form 42 electronically after April 1 for spud notice. 2) Provide cement coverage from TD to a minimum of 200' above Niobrara. Verify coverage with cement bond log. 3) Run and submit Directional Survey from TD to base of surface casing. Ensure that the wellbore complies with setback requirements in commission orders or rules prior to producing the well.
EngineerForm: (04 )
402214449
12/23/2019
This approval is good for one year and a new application must be made before October 18, 2020. Updates for the planned utilization of the well should be included with the application. The Form 7 reporting must reflect the well status dates reported on the Form 4-TA request.
EngineerForm: (04 )
402214449
12/23/2019
The Form 7 reporting must reflect the well status dates reported on the Form 4-TA request.
EngineerForm: (04 )
402503516
11/24/2020
With next year’s sundry provide a more specific plan forward. Merely specifying that the well will be plugged or RTP before the next MIT is not sufficient. EG. Bonanza Creek is working through a large backlog of PA work. Based on budgeting, Bonanza Creek currently plans to plug a total of AAA wells in in 2020, and BBB wells in 2021. Thus far, Bonanza Creek has plugged CCC wells in 2020 and is on track to meet our annual target. Currently, this well is planned to be plugged in 2021. This type of comment demonstrates that Bonanza Creek has a concrete plan forward and that said plan is being acted upon. Furthermore, this doesn't require an overly specific timeline for each well (which we understand is challenging to plan).
EngineerForm: (04 )
402503516
11/24/2020
This approval is good for one year and a new application must be made before 10/7/21. Updates for the planned utilization of the well should be included with the application
EngineerForm: (04 )
402802375
10/6/2021
1) This approval is good for one year and a new application must be made before 9/29/2022. Updates for the planned utilization of the well should be included with the application.
EngineerForm: (04 )
403108063
7/26/2022
This well is designated inactive and must be properly returned to production, plugged and abandoned, have an approved Form 5B or be submitted on a Form 6A (to be designated as Out of Service) no later than no later than November 1, 2022.
 