| Engineer | Form: (02) 400184824 07/26/2011 | 1)Note surface casing setting depth change from 550’ to 650’. Increase cement coverage accordingly and cement to surface.
2)Provide 24 hour notice of MIRU to Bo Brown via e-mail at bo.brown@state.co.us.
3)Comply with Rule 317.i and provide cement coverage from the end of the production casing to a minimum of 200' above the Niobrara. Verify coverage with cement bond log.
4)Comply with Rule 321. Run and submit Directional Survey from the end of production casing to base of surface casing. Ensure that the wellbore complies with setback requirements in commission orders or rules prior to producing the well.
|
| Engineer | Form: (04) 402045491 08/10/2022 | Red Hawk is to provide how gas is metered and used onsite for the Hahn 1-4H and detail gas gathering for this well. How and where gas is metered should be described. This information is to be provided on a Form 4 Sundry Notice with Request to Vent or Flare as the checkbox. This information is required to be submitted by August 31, 2022. |
| Engineer | Form: (04) 402045491 08/10/2022 | Operator is to provide the disposition of produced water from this well, disposition should be documented in the Submit tab Comments on the required Vent/Flare Sundry due by August 31, 2022. |