Engineer | Form: (02 ) 400153588 5/11/2011 | 1) Provide 24 hour notice of MIRU to Bo Brown via email at bo.brown@state.co.us.
2) Comply with Rule 317.d and set at least 780’ of surface casing, cement to surface. –OR- Operator may set 550’ of surface casing as proposed and cement production casing from 780’ to 50’ above surface casing shoe. Verify coverage with cement bond log.
3) Comply with Rule 317.i and provide cement coverage from TD to a minimum of 200' above Niobrara. Verify coverage with cement bond log.
4) Comply with Rule 321. Run and submit Directional Survey from TD to base of surface casing. Ensure that the wellbore complies with setback requirements in commission orders or rules prior to producing the well.
|
Engineer | Form: (02 ) 400328198 9/25/2012 | 1) Comply with Rule 317.d and set at least 780’ of surface casing, cement to surface. –OR- Operator may set 550’ of surface casing as proposed and cement intermediate (7") casing from 780’ to 50’ above surface casing shoe. Verify coverage with cement bond log.
2) Comply with Rule 317.i and provide cement coverage from base of intermediate (7") casing to a minimum of 200' above Niobrara. Verify coverage with cement bond log.
3) Comply with Rule 321. Run and submit Directional Survey from TD to base of surface casing. Ensure that the wellbore
complies with setback requirements in commission orders or rules prior to producing the well. |
Engineer | Form: (04 ) 402045313 4/12/2022 | For combustion of gas due to upset conditions, criteria set forth by 903.d.(1) limiting the duration and requiring records being kept of those instances where combustion was necessary must be followed after January 15, 2021. |