Skip to Main Content

COGIS DB

 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation IDRelated Facilities
WELL05-123-34141SLICK ROCK
17-11-7-60
CARRIZO OIL & GAS INC
10338
AL
7/24/2012
WILDCAT
99999
WELD  123
NWNW 17 7N60W 6
424712View Related
 
COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
EngineerForm: (02 )
400170630
7/1/2011
1) Provide 24 hour notice of MIRU to Colby Horton at 970-467-2517 or e-mail at colby.horton@state.co.us. 2) Plug back pilot hole as proposed on line 33 comments or at a minimum: Set 70 sks cement from 50’ below D-Sand base to 100’ above D-Sand top. Set 40 sks cement 50’ above Niobrara top. This is in addition to kick off plug.
EngineerForm: (02 )
400171644
7/1/2011
1) Provide 24 hour notice of MIRU to Colby Horton at 970-467-2517 or e-mail at colby.horton@state.co.us. 2) Provide cement coverage from base of intermediate casing to a minimum of 200' above Niobrara. Verify coverage with cement bond log. 3) Run and submit Directional Survey from TD to base of surface casing. Ensure that the wellbore complies with setback requirements in commission orders or rules prior to producing the well.
PermitForm: (02 )
400170630
8/12/2011
A well being completed deeper than 2500 feet must be 600 feet from a lease line and be at least 1200 feet from a well permitted/producing from the same formation, or requires an approved exception location. per rule 318a.
 
COGIS - Best Management Practice Results
BMP TypeSource DocumentBest Management Practices
Material Handling and Spill PreventionForm: (02 )
400170630
8/15/2011
Operator will ensure 110 percent secondary containment for any volume of fluids contained at the well site during drilling and completion. Operator will implement best management practices to contain any unintentional release of fluids.
Storm Water/Erosion ControlForm: (02 )
400170630
8/15/2011
Operator has designed the well pad with insloping and a storm water control ditch to prevent storm water run-on/runoff and the release of fluids from the location. See attached Construction Layout Drawing.
Site SpecificForm: (02 )
400170630
8/15/2011
Fresh water for the Fresh Water Storage Pit comes from water provider; water sources permitted for consumable industrial use.
Material Handling and Spill PreventionForm: (02 )
400170630
8/15/2011
Operator shall not allow any fluids to flow back to the Fresh Water Storage Pit.
Site SpecificForm: (02 )
400170630
8/15/2011
Fresh Water Storage Pit shall contain fresh water only and signage prohibiting the use of the pit for any fluid that does not come from municipal, irrigation or surface water source.
ConstructionForm: (02 )
400170630
8/15/2011
The location will be fenced and the fenced area will include the Fresh Water Storage Pit.
Pre-ConstructionForm: (02 )
400170630
8/15/2011
The COGCC to be notified 48 hours prior to construction of the Fresh Water Storage Pit.
Material Handling and Spill PreventionForm: (02 )
400171644
8/15/2011
Operator will ensure 110 percent secondary containment for any volume of fluids contained at the well site during drilling and completion. Operator will implement best management practices to contain any unintentional release of fluids.
Storm Water/Erosion ControlForm: (02 )
400171644
8/15/2011
Operator has designed the well pad with insloping and a storm water control ditch to prevent storm water run-on/runoff and the release of fluids from the location. See attached Construction Layout Drawing.
Site SpecificForm: (02 )
400171644
8/15/2011
Fresh water for the Fresh Water Storage Pit comes from water provider; water sources permitted for consumable industrial use.
Material Handling and Spill PreventionForm: (02 )
400171644
8/15/2011
Operator shall not allow any fluids to flow back to the Fresh Water Storage Pit.
Site SpecificForm: (02 )
400171644
8/15/2011
Fresh Water Storage Pit shall contain fresh water only and signage prohibiting the use of the pit for any fluid that does not come from municipal, irrigation or surface water source.
ConstructionForm: (02 )
400171644
8/15/2011
The location will be fenced and the fenced area will include the Fresh Water Storage Pit.
Pre-ConstructionForm: (02 )
400171644
8/15/2011
The COGCC to be notified 48 hours prior to construction of the Fresh Water Storage Pit.