| Engineer | Form: (02) 400161123 07/22/2011 | 1) Provide 24 hour notice of MIRU to Bo Brown at e-mail bo.brown@state.co.us.
2) Comply with Rule 317.i and provide cement coverage from TD to a minimum of 200' above Niobrara. Verify coverage
with cement bond log.
3) Comply with Rule 321. Run and submit Directional Survey from TD to base of surface casing. Ensure that the wellbore
complies with setback requirements in commission orders or rules prior to producing the well. |
| Engineer | Form: (02) 400380985 03/21/2013 | 1)Provide notice of MIRU via an electronic Form 42.
2)Comply with Rule 317.i and provide cement coverage a minimum of 200' above the Niobrara. Verify cement coverage with a cement bond log per Rule 317.o.
3)Comply with Rule 321. Run and submit Directional Survey from TD to base of surface casing. Ensure that the wellbore complies with setback requirements in commission orders or rules prior to producing the well.
|