WELL05-123-30376ADLER
16-33
KERR MCGEE OIL & GAS ONSHORE LP
47120
PA
5/2/2018
WATTENBERG
90750
WELD  123
SESE 33 3N68W 6
413517View Related
 
COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
EngineerForm: (06)
401505260
02/07/2018
Prior to starting plugging operations a bradenhead test shall be performed. 1) If, before opening the bradenhead valve, the beginning pressure is greater than 25 psi, sampling is required. 2) If pressure remains at the conclusion of the test, or if any liquids were present during the test, sampling is required. The Form 17 shall be submitted within 10 days of the test. Sampling shall comply with Operator Guidance - Bradenhead Testing and Reporting Instructions. If samples are collected, copies of all final laboratory analytical results shall be provided to the COGCC within three (3) months of collecting the samples.
EngineerForm: (06)
401505260
02/07/2018
1) Provide 48 hour notice of plugging MIRU via electronic Form 42. 2) Properly abandon all flowlines as per Rule 1103. File electronic Form 42 once abandonment complete. 3) Operator shall implement measures to control unnecessary and excessive venting, to protect the health and safety of the public, and to ensure that vapors and odors from well plugging operations do not constitute a nuisance or hazard to public welfare. 4) Production casing stub plug is also surface casing shoe plug, this plug must be tagged at 827’ or 50’ above depth production casing is cut and pulled, whichever is shallower. If there is pressure or evidence of gas migration after placing the CIBP at 3800’, do not pump the stub plug and shoe plug as one plug. Contact COGCC engineering for an update to the plugging procedure. Leave at least 100’ of cement in the wellbore for each plug.
 