Skip to Main Content

COGIS DB

 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation IDRelated Facilities
WELL05-123-29643KOESTER
18-33-6
KP KAUFFMAN COMPANY INC
46290
PR
9/1/2024
WATTENBERG
90750
WELD  123
CNW 33 4N67W 6
332775View Related
 
COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
AgencyForm: (02 )
1760059
12/29/2009
1) Provide 24 hour notice of MIRU to Ed Binkley at 970-506-9834 or e-mail at ed.binkley@state.co.us 2) Comply with Rule 317.i and provide cement coverage from TD to a minimum of 200' above Niobrara. Verify coverage with cement bond log. 3) Run and submit Directional Survey from TD to base of surface casing. The operator shall comply with Rule 321, and it shall be the operator’s responsibility to ensure that the wellbore complies with setback requirements in commission orders or rules prior to producing the well.
EngineerForm: (04 )
403706456
3/12/2024
1) Provide electronic Form 42 Notice of MIRU 2 business days ahead of operations. 2) The additional cement referenced shall be placed as indicated and codumented with a Form 5 within 30 days of repair operations. The placed cement shall be verified with a CBL. Repair shall also be pressure tested for a minimum of 15 minutes. Pressure test and CBL shall be provided with the Form 5.
 
COGIS - Best Management Practice Results
No records to display.