Engineer | Form: (04 ) 400684503 9/16/2014 | 1) The additional cement referenced shall be placed as indicated and comply with Rule 317.i. The placed cement shall be verified with a CBL and documented with a Form 5 Drilling Completion Report.
2) Please submit gyro survey data with Form 5 Drilling Completion Report. |
Engineer | Form: (04 ) 402369898 10/1/2020 | This approval is good for one year and a new application must be made before April 14, 2021. Updates for the planned utilization of the well should be included with the application.
|
Engineer | Form: (04 ) 402369898 10/1/2020 | The Form 7 reporting must reflect the well status dates reported on the Form 4-TA request.
|
Engineer | Form: (04 ) 402678184 10/6/2021 | 1) This approval is good for one year and a new application must be made before 05/03/2022. Updates for the planned utilization of the well should be included with the application.
2) Perform a bradenhead test and submit a Form 17 prior to submittal of the next year’s request for continued TA status.
3) The Form 7, Operators Report of Monthly Operations, must correctly reflect the well status and dates reported on the Form 4, Sundry Notice-Request for Continued Temporarily Abandoned Status. |
Engineer | Form: (04 ) 403031853 4/29/2022 | 1) Effective April 30, 2022 this well will be designated inactive and must be properly returned to production, plugged and abandoned, have an approved Form 5B or be added to a Form 6A list no later than November 1, 2022.
|