Skip to Main Content

COGIS DB

 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation IDRelated Facilities
WELL05-123-21320GREENS FEDERAL
5-8A
KERR MCGEE OIL & GAS ONSHORE LP
47120
PA
11/1/2017
WATTENBERG
90750
FORT LUPTON/WELD  123
NENW 8 1N66W 6
336284View Related
 
COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
EngineerForm: (06 )
401243118
4/6/2017
1) Prior to starting plugging operations a bradenhead test shall be performed. If the beginning pressure is greater than 25 psi, or if pressure remains at the conclusion of the test, or if any liquids were present contact COGCC Engineer for sampling requirements. The Form 17 shall be submitted within 10 days of the test. 2) Provide 48 hour notice of plugging MIRU via electronic Form 42. 3) Properly abandon flowlines as per Rule 1103. File electronic Form 42 once abandonment complete. 4) Submit gyro survey data from 06/04/2012 with Form 6 Subsequent Report of Abandonment (directional survey from 2003 already submitted). 5) Production casing stub plug is also surface casing shoe plug, this plug must be tagged at 862’ or shallower. Leave at least 100’ of cement in the wellbore for each plug.
 
COGIS - Best Management Practice Results
No records to display.