| Planning | Form: (02 ) 401151250 12/9/2016 | Planning:
• The operator shall identify the location of the wellbore with a permanent monument as specified in Rule 319.a.(5). The operator shall also inscribe or imbed the well number and date of plugging upon the permanent monument.
|
| Planning | Form: (02 ) 401151250 12/9/2016 | Planning:
• Lighting on location is considered temporary and will be used during recompletion activities. Permanent lighting will not be installed and utilized during normal production operations. Temporary lighting will be directed downward, inward, and shielded towards location to avoid glare on public roads and Building Units within 1,000 feet. Lighting will be turned off when practical, i.e., no operations being conducted. |
| Traffic control | Form: (02 ) 401151250 12/9/2016 | Traffic Control:
• Recomplete operations – The recomplete rig will access the well from the north a county road 20. Dust suppression will be used on county road and temporary access road, if needed. Dust suppression could include a combination of water, magnesium chloride, or calcium chloride. Limited traffic speed could also be used for dust mitigation.
• Permanent operations - Production of the location will use the existing access road, located directly off of Weld County Road 20.
|
| General Housekeeping | Form: (02 ) 401151250 12/9/2016 | General Housekeeping:
• All surface trash, debris, scrap or discarded material connected with the operations of the property shall be removed from the premises or disposed of in a legal manner.
|
| General Housekeeping | Form: (02 ) 401151250 12/9/2016 | General Housekeeping:
• Within ninety (90) days after a well is plugged and abandoned, the well site shall be cleared of all non-essential equipment, trash, and debris. For good cause shown, an extension of time may be granted by the Director.
|
| Material Handling and Spill Prevention | Form: (02 ) 401151250 12/9/2016 | Material Handling and Spill Prevention:
• Any material not in use that might constitute a fire hazard shall be removed a minimum of twenty-five (25) feet from the wellhead, tanks and separator. Any electrical equipment installations inside the bermed area shall comply with API RP 500 classifications and comply with the current national electrical code as adopted by the State of Colorado.
|
| Construction | Form: (02 ) 401151250 12/9/2016 | Construction:
• Unless otherwise requested by the Surface Owner, well sites constructed within the Designated Setback location will be fenced to restrict access by unauthorized persons.
|
| Construction | Form: (02 ) 401151250 12/9/2016 | Construction:
• At the time of construction, all leasehold roads shall be constructed to accommodate local emergency vehicle access requirements, and shall be maintained in a reasonable condition. NEI plans on building a temporary access road off of Weld County Road 20 for recompletion activities.
• Production of the location will use existing road off of Weld County Road 20.
|
| Noise mitigation | Form: (02 ) 401151250 12/9/2016 | Noise Mitigation:
• A baseline sound survey will be completed at the residence(s) located 490 feet north east of the Haffner 41-23 well. Engineered sound walls around the recomplete rig will be used, as applicable based on the noise survey findings.
|