Engineer | Form: (04 ) 401307829 6/15/2017 | 1) Prior to starting repair work, collect bradenhead and production gas samples for laboratory analysis. Copies of all final laboratory analytical results shall be provided to the COGCC within three (3) months of collecting the samples. The analytical results shall be submitted to the COGCC in an approved electronic data deliverable format.
2) The additional cement referenced shall be placed as indicated and brought to at least 50’ above the surface casing shoe. The placed cement shall be verified with a CBL and documented with a Form 5.
3) After completing repair work a Bradenhead Test shall be performed within the next 60 days and the Form 17 submitted within 10 days of the test. If pressure remains on the Bradenhead or any liquids were present during the test additional well work may be required. |
Engineer | Form: (04 ) 401585073 3/26/2018 | 1) Prior to starting repair work, perform a bradenhead test and collect bradenhead and production gas samples for laboratory analysis. Copies of all final laboratory analytical results shall be provided to the COGCC within three (3) months of collecting the samples. The analytical results shall be submitted to the COGCC in an approved electronic data deliverable format.
2) The additional cement referenced shall be placed as indicated, verified with a CBL and documented with a Form 5.
3) After completing repair work a Bradenhead Test shall be performed within the next 60 days and the Form 17 submitted within 10 days of the test. If pressure remains on the Bradenhead or any liquids were present during the test additional well work may be required. |
Engineer | Form: (04 ) 402302252 2/24/2020 | 1. Operator shall implement measures to control venting, to protect health and safety, and to ensure that vapors and odors from well operations do not constitute a nuisance or hazard to public welfare.
2. Prior to starting bradenhead mitigation, if a sample has not been collected within the last twelve months collect bradenhead and production gas samples for laboratory analysis. Sampling shall comply with Operator Guidance - Bradenhead Testing and Reporting Instructions, Appendix A: Liquid and Gas Sampling. Copies of all final laboratory analytical results shall be provided to the COGCC within three months of collecting the samples.
3. During the first day of mitigation operator shall implement measures to get an initial estimate of the gas flow rate and/or volume from the bradenhead. During the shut-in period record pressure data to adequately characterize the build-up. This mitigation plan may be used for six consecutive months.
4. At the conclusion of the six months, conduct a new bradenhead test and submit the Form 17 within ten days of the test and submit a Form 4 Sundry that summarizes current well condition. The sundry should include details of the future plans and the flow rate information and pressure data.
|
Engineer | Form: (04 ) 402391743 8/26/2020 | Operator shall continue to monitor pressure, and report to COGCC through annual test reporting.
|
OGLA | Form: (06 ) 403982512 11/14/2024 | Due to proximity to expected shallow groundwater, operator will use secondary containment for all tanks and other liquid containers. |
Engineer | Form: (06 ) 403982512 11/21/2024 | Verify existing cement coverage by CBL - submit to ECMC for verification of plugging orders prior to continuing plugging operations. |
Engineer | Form: (06 ) 403982512 11/21/2024 | Prior to starting plugging operations a Bradenhead test shall be performed if there has not been a reported Bradenhead test within the 60 days immediately preceding the start of plugging operations.
1) If, before opening the Bradenhead valve, the beginning pressure is greater than 25 psi, sampling is required.
2) If pressure remains at the conclusion of the test, or if any liquids were present during the test, sampling is required.
The Form 17 shall be submitted within 10 days of the test. Sampling shall comply with Operator Guidance - Bradenhead Testing and Reporting Instructions. If samples are collected, copies of all final laboratory analytical results shall be provided to the ECMC within three (3) months of collecting the samples. |
Engineer | Form: (06 ) 403982512 11/21/2024 | Operator shall implement measures to control venting, to protect health and safety, and to ensure that vapors and odors from well plugging operations do not constitute a nuisance or hazard to public welfare. |
Engineer | Form: (06 ) 403982512 11/21/2024 | 1) Provide 2 business day notice of plugging MIRU via electronic Form 42, and provide 48 hours Notice of Plugging Operations, prior to mobilizing for plugging operations via electronic Form 42. These are 2 separate notifications, required by Rules 405.e and 405.I.
2) Prior to placing the 925’ plug: verify that all fluid migration (liquid and gas) has been eliminated. If evidence of fluid migration or pressure remains, contact ECMC Engineer for an update to plugging orders.
3) After isolation has been verified, pump surface casing shoe plug. If cement is not circulated to surface, shut-in, WOC 4 hours then tag plug – must be at 675’ or shallower and provide 10 sx plug at the surface.
4) Leave at least 100’ of cement in the wellbore for each plug without mechanical isolation.
5) After surface plug and prior to cap, verify isolation by either a 15 minute bubble test or 15 minute optical gas imaging recording. If there is indication of flow contact ECMC Engineering. Provide a statement on the 6SRA which method was used and what was observed. Retain records of final isolation test for 5 years.
6) With the Form 6 SRA operator must provide written documentation which positively affirms each COA listed above has been addressed. |
Engineer | Form: (06 ) 403982512 11/21/2024 | FLOWLINE AND SITE CLOSURE
1) Consistent with Rule 911.a, a Form 27 must be approved prior to cut and cap, conducting flowline abandonment, or removing production equipment. Allow 30 days for Director review of the Form 27; include the Form 27 document number on the Form 44 for offsite flowline abandonment (if applicable) and on the Form 6 Subsequent.
2) Properly abandon flowlines per Rule 1105. If flowlines will be abandoned in place, include with the Form 27: pressure test results conducted in the prior 12 months as well as identification of any document numbers for a ECMC Spill/Release Report, Form 19, associated with the abandoned line. |