COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
EngineerForm: (06)
401077798
09/12/2016
1) Prior to starting plugging operations, a bradenhead test shall be performed. If any pressure remains at the conclusion of the test or any liquids were present contact COGCC Engineer for sampling requirements. The Form 17 shall be submitted within 10 days of the test. 2) Provide 48 hour notice of plugging MIRU via electronic Form 42. 3) Properly abandon flowlines as per Rule 1103. File electronic Form 42 once abandonment complete. 4) Production casing stub plug is also surface casing shoe plug. After pumping stub/shoe plug, shut down and wait on cement at minimum 4 hours. Check surface casing pressure, if pressure remains call COGCC for an update to plugging orders in order to verify gas migration has been eliminated. Plug must be tagged at 762’ or shallower. Leave at least 100’ cement in the wellbore for each plug.
 
COGIS - Best Management Practice Results
No records to display.