Permit | Form: (06 ) 401037231 5/10/2016 | Need to update form 7 reporting for the sussex formation before the form 6 subsequent gets approved. It was TA'd in 4/5/2010, then AB in 2/1/2012. The production reports have been saying SI. |
Engineer | Form: (06 ) 401037231 5/10/2016 | 1) Prior to starting plugging operations, a bradenhead test shall be performed. If any pressure remains at the conclusion of the test or any liquids were present call COGCC Engineer for sampling requirements. The Form 17 shall be submitted within 10 days of the test.
2) Provide 48 hour notice of plugging MIRU via electronic Form 42.
3) Properly abandon flowlines as per Rule 1103. File electronic Form 42 once abandonment complete.
4) If surface casing shoe plug is not circulated to surface then tag plug – must be 463’ or shallower and provide 10 sx plug at the surface. Leave at least 100’ of cement in the wellbore for each plug.
|