Skip to Main Content

COGIS DB

 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation IDRelated Facilities
WELL05-123-09942CARL H. ADLER
2
KERR MCGEE OIL & GAS ONSHORE LP
47120
PA
4/6/2015
WATTENBERG
90750
MEAD/WELD  123
NWNW 35 3N68W 6
318779View Related
 
COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
EngineerForm: (06)
400701822
10/29/2014
Note change in plugging procedure: 1) Submit Form 42 electronically to COGCC 48 hours prior to MIRU. 2) Run CBL to verify the top of cement is at least 200’ over Niobrara and adequately isolates the Fox Hills aquifer. If it does not exist as required, provide this coverage as part of this plugging project. Use CBL results to verify the setting depth of and stage cement pumped through the DV tool. Add cement if needed. 3) RIH w/ dump bailer and add 2 sxs cement to CIBP@7200'. 4) For 600' plug: pump plug and displace, shut-in, WOC 4 hours and tag plug – must be 210’ or shallower. 5) Properly abandon flowlines as per Rule 1103. File electronic Form 42 once abandonment complete. 6) Please submit gyro survey data with Form 6 (s) Subsequent Report of Abandonment.
 
COGIS - Best Management Practice Results
No records to display.