Skip to Main Content

COGIS DB

 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation IDRelated Facilities
WELL05-123-09744Cochran USX UU
11-8
KERR MCGEE OIL & GAS ONSHORE LP
47120
PA
2/9/2015
WATTENBERG
90750
WELD  123
SENE 11 1N68W 6
318702View Related
 
COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
EngineerForm: (06 )
400721386
11/26/2014
1) Submit Form 42 electronically to COGCC 48 hours prior to MIRU. 2) Run CBL to verify the top of primary or squeezed cement is at least 200’ over Niobrara and adequately isolates the Shannon/Sussex and aquifer. If it does not exist as required, provide this coverage as part of this plugging project. Use CBL results to verify the setting depth of and stage cement pumped through the DV tool. If DV cement shallower than 830' email copy of CBL to COGCC and contact COGCC for possible change in plugging orders. 3) If CBL shows DV tool cement does not reach surface switching to a pull casing plugging is acceptable. 4) For 980' plug: pump plug and displace, shut-in, WOC 4 hours and tag plug – must be 243’ or shallower. 5) Properly abandon flowlines as per Rule 1103. File electronic Form 42 once abandonment complete. 6) Please submit gyro survey data with Form 6 (s) Subsequent Report of Abandonment.
 
COGIS - Best Management Practice Results
No records to display.