Skip to Main Content

COGIS DB

 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation IDRelated Facilities
WELL05-123-09364NELSON
4
TEXAS TEA OF COLORADO LLC DBA TEXAS TEA LLC
87195
PA
8/2/2014
SPINDLE
77900
FREDERICK/WELD  123
NESW 32 2N68W 6
311320View Related
 
COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
EngineerForm: (06)
2091164
07/08/2014
Note change in plugging procedure: 1) Submit Form 42 electronically to COGCC 48 hours prior to MIRU. 2) No CBL on file. Run CBL to verify primary cement provides sufficient coverage over Sussex. If TOC deeper than 4030' contact COGCC for plugging modifications. 3) Move CIBP w/2 sxs @ 4830' to 4200' to isolate Sussex zone which is productive in this area. 4) If unable to pull casing contact COGCC for plugging modifications. 5) If maintain circulation do not need to tag stub plug @ 3824'. 6) For 723' plug: pump plug and displace, shut-in, WOC 4 hours and tag plug – must be 623’ or shallower. If shoe plug not circulated to surface then place 10 sx inside casing at surface. Leave at least 100' for each plug. 7) Properly abandon flowlines as per Rule 1103. File electronic Form 42 once abandonment complete.
 
COGIS - Best Management Practice Results
No records to display.