COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
EngineerForm: (04 )
401138175
10/28/2016
1) Prior to starting repair work a bradenhead test shall be performed. If any pressure remains at the conclusion of the test or any liquids were present contact COGCC Engineer for sampling requirements before pumping any cement. The Form 17 shall be submitted within 10 days of the test. 2) The additional cement referenced shall be placed as indicated. The placed cement shall be verified with a CBL and documented with a Form 5.
EngineerForm: (06 )
401467935
2/2/2018
Post Plugging Reporting • Form 17 Bradenhead Test Report shall be submitted within 10 days of the test. • File electronic Form 42 once flowline abandonment is complete. • If samples are collected, copies of all final laboratory analytical results shall be provided to the COGCC within three (3) months of collecting the samples.
EngineerForm: (06 )
401467935
2/2/2018
Plugging • Provide 48 hour notice of plugging MIRU via electronic Form 42. • If there is fluid migration or shut-in pressure on the well prior to pumping any plug(annular or casing) that isolates deepest aquifer or the surface casing shoe (whichever is deeper) contact COGCC Engineer for revised plugging orders. • If the shoe plug, or combined stub/shoe plug, is not circulated to the surface then the plug shall be tagged and must be 50’ into the shoe, or 50’ above the cut, whichever is shallower. • Place a 50' plug(minimum) at the surface, all other plugs shall have at least 100' of cement left in the casing. • Properly abandon flowlines as per Rule 1103.
EngineerForm: (06 )
401467935
2/2/2018
Bradenhead Testing Prior to starting plugging operations, a bradenhead test shall be performed. If the initial shut-in bradenhead pressure is greater than 25 psi or liquid is present at any time during the test, sampling is required. Sampling shall comply with Operator Guidance - Bradenhead Testing and Reporting Instructions, Appendix A: Liquid and Gas Sampling.
EngineerForm: (06 )
401467935
2/2/2018
Venting Operator shall implement measures to control unnecessary and excessive venting, to protect the health and safety of the public, and to ensure that vapors and odors from well plugging operations do not constitute a nuisance or hazard to public welfare.
 
COGIS - Best Management Practice Results
No records to display.