Skip to Main Content

COGIS DB

 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation IDRelated Facilities
WELL05-121-08367PIEPER LEO
3-29
LILIS ENERGY INC
10495
PA
7/10/2017
RED CLOUD
72650
WASHINGTON  121
SWNE 29 1N53W 6
317077View Related
 
COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
PermitForm: (06)
2226666
05/23/2017
Submit Operator's Monthly Production Reports (Form 7) required for compliance with Rule 309 within 30 days.
EngineerForm: (06)
2226666
06/06/2017
Note changes to submitted form. 1) Provide 48 hour notice of MIRU via electronic Form 42. 2) Shoe plug: Tag plug 50’ above surface casing shoe. 3) Surface plug: Cement from 50' to surface in casing and annulus. 4) Properly abandon flowlines per Rule 1103. File Form 42 when done. 5) Abandoned well marker shall be inscribed with the well identification per Rule 319.a.(5).
EngineerForm: (06)
2226666
06/06/2017
Bradenhead: Prior to initiation of plugging operations, a Bradenhead test shall be performed. Form 17 shall be submitted within 10 days. If there is 25 psi or greater pressure on the Bradenhead, or flowed any liquids from the Bradenhead, collect samples. See COGCC website - Operator Guidance - Bradenhead Testing and Reporting Instructions, Appendix A: Liquid and Gas Sampling.
 
COGIS - Best Management Practice Results
No records to display.