Engineer | Form: (06 ) 400867228 7/15/2015 | This well must have an updated Form 26 submitted and approved prior to the approval of the Subsequent Report of Abandonment. |
Engineer | Form: (06 ) 400867228 7/15/2015 | All delinquent Monthly Report of Operations, Form 7 must be submitted and approved prior to the approval of the Subsequent Report of Abandonment. |
Engineer | Form: (06 ) 400867228 7/15/2015 | All plugs and cement placed during attempted leak repair shall be described on the Subsequent Report of Abandonment. Provide contractor's job summaries. |
Engineer | Form: (06 ) 400867228 7/15/2015 | 1) Provide 48 hour notice of plugging MIRU via electronic Form 42.
2) CBL should be submitted to COGCC for confirmation of required plugging plans.
3) Properly abandon flowlines as per Rule 1103. File electronic Form 42 once abandonment complete.
|