| Permit | Form: (02) 402988834 10/05/2022 | Operator shall comply with Notice to Operators: Interim Reclamation Procedures for Delayed Operations (dated January 5, 2017).
|
| Engineer | Form: (02) 402988834 10/31/2022 | 1)Operator shall comply with the most current revision of the Northwest Colorado Notification Policy. See attached notice.
2)Operator shall provide cement coverage from the production casing shoe (4+1/2" SECOND STRING) to a minimum of 200' above all Mesa Verde Group (and Ohio Creek Formation, if present) oil, gas, and water-bearing sandstone and coalbed formations. Verify production casing cement coverage with cement bond log. |
| Engineer | Form: (04) 404470248 02/10/2026 | After 04/01/2026 ,conduct a bradenhead test, submit a Form 17, and submit a Form 4 Sundry that summarizes current well condition. The sundry should include a complete sample analysis interpretation, bradenhead test description, and twenty four months of pressure monitoring data. |
| Engineer | Form: (04) 404637950 05/04/2026 | Within 60 days collect bradenhead, intermediate and production gas samples for isotopic laboratory analysis. Sampling will comply with Operator Guidance - Bradenhead Testing and Reporting Instructions, Appendix A: Liquid and Gas Sampling. Copies of all final laboratory analytical results will be provided to the ECMC within three months of collecting the samples.
Submit a Form 4 BHP with a complete sample analysis interpretation and pressure data analysis |