| Engineer | Form: (02) 402403099 09/02/2020 | 1)Operator shall comply with the most current revision of the Northwest Colorado Notification Policy. See attached notice.
2)Operator shall provide cement coverage from the production casing shoe (4+1/2" FIRST STRING) to a minimum of 200' above all Mesa Verde Group (and Ohio Creek Formation, if present) oil, gas, and water-bearing sandstone and coalbed formations. Verify production casing cement coverage with a cement bond log.
|
| Permit | Form: (02) 402403099 10/06/2020 | Operator shall comply with Notice to Operators: Interim Reclamation Procedures for
Delayed Operation (dated January 5, 2017).
|
| Permit | Form: (02) 402403099 10/06/2020 | If conductors are preset, operator shall comply with Notice to Operators: Procedures for Preset Conductors (dated September 1, 2016). |
| Engineer | Form: (04) 403003283 04/20/2022 | 1) Operator shall comply with the most current revision of the Northwest Colorado Notification Policy. See attached notice.
2) Operator shall provide cement coverage from the production casing shoe (4+1/2" FIRST STRING) to a minimum of 200' above all Mesa Verde Group (and Ohio Creek Formation, if present) oil, gas, and water-bearing sandstone and coalbed formations. Verify production casing cement coverage with a cement bond log.
|
| Engineer | Form: (04) 403774588 05/06/2024 | 1) For applicable operations, submit a Form 5A or 5 within 30 days of the work with job related documents including a minimum of one of the following attachments: operations summary, cement job summary and/or wireline summary. Additionally, include CBL’s and any additional logs run. |