COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
PermitForm: (02)
401972082
08/12/2020
1. If conductors are preset, Operator shall comply with Notice to Operators: Procedures for Preset Conductors (dated September 1, 2016, revised October 6, 2016).
PermitForm: (02)
401972082
08/12/2020
1.Operator shall comply with Notice to Operators: Interim Reclamation Procedures for Delayed Operation (dated January 5, 2017).
EngineerForm: (02)
401972082
08/12/2020
1) Operator shall comply with the most current revision of the Northwest Notification Policy. 2) Operator shall provide cement coverage from the first string casing shoe (9 5/8" FIRST STRING) to a minimum of 200' above all Mesaverde Group (and Ohio Creek Formation, if present) oil, gas, and water-bearing sandstone and coalbed formations. Verify first string casing cement coverage with a cement bond log. 3) Salt-based drilling fluid is to be used only after all fresh water aquifers are covered.
 
COGIS - Best Management Practice Results
BMP TypeSource DocumentBest Management Practices
ConstructionForm: (02 )
401972082
9/16/2020
-A Field Wide Stormwater Management Plan (SWMP) for the Piceance Creek Program is on file at the XTO Energy Inc.(21459 CR5, Rifle, CO, 81650) office. A Site Specific SWMP including a Site Plan is in place for this location. -Spill Prevention, Control and Countermeasures (SPCC) for the Piceance Creek Program is on file at the XTO Energy Inc. (21459 CR5, Rifle, CO, 81650) office. The Field Wide and Site Specific SWMPs each address SPCC during construction operations. -Inspections of the project site and maintenance of installed BMP’s shall be conducted in accordance with the CDPHE CDPS permit and field wide plan.
Drilling/Completion OperationsForm: (02 )
401972082
9/16/2020
Open-hole Resistivity Log with Gamma Ray Log will be run from the kick-off point into the surface casing. A Cement Bond Log with Gamma-Ray will be run on production casing, or on intermediate casing if a production liner is run. The horizontal portion of the wellbore will be logged with a measured-while-drilling gamma-ray log. The Form 5, Completion Report, will list all logs run and have those logs attached.