| Engineer | Form: (02) 400403249 05/06/2013 | (1) COMPLIANCE WITH THE MOST CURRENT REVISION OF THE NORTHWEST COLORADO NOTIFICATION POLICY IS REQUIRED. |
| Engineer | Form: (04) 400690198 10/01/2014 | (1) Operator shall provide cement coverage from the production casing shoe (4+1/2" First String) to a minimum of 200' above all Mesa Verde Group (and Ohio Creek Formation, if present) oil, gas, and water-bearing sandstone and coalbed formations. Verify production casing cement coverage with a cement bond log. |
| Engineer | Form: (04) 403377377 05/09/2023 | 1) Report work completed with a Form 4 Sundry REPORT OF WORK DONE - Repair Well noting final pressure test results and include any operational or job summaries. If the wellbore geometry changes or there is not an updated WBD in the well file submit an updated WBD.
2) Complete a bradenhead test following completion of the repair and submit results on a Form 17 or directive approved method
|
| OGLA | Form: (04) 403377377 05/09/2023 | Operator will control all emissions and fluids during casing repair operations. |