| Engineer | Form: (02) 400402178 05/06/2013 | (1) COMPLIANCE WITH THE MOST CURRENT REVISION OF THE NORTHWEST COLORADO NOTIFICATION POLICY IS REQUIRED. |
| Engineer | Form: (04) 401053903 05/27/2016 | 1) Submit casing pressure test results with subsequent Form 4 documenting actual casing repair performed. |
| Engineer | Form: (04) 403474394 08/23/2023 | 1) For applicable operations , report work completed with a Form 4 Sundry REPORT OF WORK DONE - Repair Well noting final pressure test results and include any operational or job summaries. If the wellbore geometry changes or there is not an updated WBD in the well file submit an updated WBD.
2) For applicable operations, submit a Form 5A or 5 within 30 days of the work with job related documents including a minimum of one of the following attachments: operations summary, cement job summary and/or wireline summary. Additionally, include CBL’s and any additional logs run
3) Repair well within 6 months of failed bradenhead test 1/03/2024
4) Complete a bradenhead test following completion of the repair and submit results on a Form 17 or directive approved method |