Storm Water/Erosion Control | Form: (02 ) 400238404 5/10/2012 | STORM WATER PLANS AND EROSION CONTROL METHODS WILL BE USED TO ENSURE SITE STABILIZATION AND TO ENSURE ADEQUATE ENVIRONMENTAL SAFEGUARDS ARE IN PLACE TO PREVENT ANY STORM WATER RUNOFF. INSPECTIONS WILL BE DOCUMENTED AND FILED IN THE RANGELY FIELD OFFICE. CHEVRON RANGELY HAS A ANNUALLY REVIEWED FIELD WIDE STORMWATER MANAGEMENT PLAN. |
Wildlife | Form: (02 ) 400238404 5/10/2012 | POWERLINE DESIGN TO MINIMIZE RAPTOR ELECTROCUTION RISK |
Material Handling and Spill Prevention | Form: (02 ) 400238404 5/10/2012 | ALL FLUIDS WILL BE STORED IN APPROPRIATE CONTAINERS AND IN SECONDARY CONTAINMENT SYSTEMS ENGINEERED TO CONTAIN 150 PERCENT OF THE LARGEST VESSEL VOLUME. CHEVRON HAS AN ANNUALLY UPDATED ENGINEER CERTIFIED FULL FIELD SPCC PLAN.
|