WELL05-103-11460FEDERAL RGU
343-24-198
TEP ROCKY MOUNTAIN LLC
96850
PR
9/1/2023
SULPHUR CREEK
80090
RIO BLANCO  103
NWSE 24 1S98W 6
335724View Related
 
COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
AgencyForm: (02 )
2095252
3/19/2010
1)24 HOUR SPUD NOTICE REQUIRED. E-MAIL: Shaun.Kellerby@state.co.us 2)CEMENT TOP VERIFICATION BY CBL REQUIRED. 3)THE PROPOSED SURFACE CASING IS MORE THAN 50' BELOW THE DEPTH OF THE DEEPEST WATER WELL WITHIN 1MILE OF THE SURFACE LOCATION WHEN CORRECTED FOR ELEVATION DIFFERENCES. THE DEEPEST WATER WELL WITHIN 1 MILE IS 3000 FEET DEEP.
OGLAForm: (04 )
403119743
8/3/2022
Operator will implement measures to capture, combust, or control emissions to protect health and safety, and to ensure that vapors and odors from well completion(s), well repair/maintenance, well perforating, temporary abandonment activities, additional equipment installation, and/or testing operations with a workover rig, wireline rig, or other heavy equipment do not constitute a nuisance or hazard to public health, welfare and the environment.
EngineerForm: (04 )
404117771
3/11/2025
1. Operator will implement measures to control venting, to protect health and safety, and to ensure that vapors and odors from well operations do not constitute a nuisance or hazard to public welfare. 2. Well to be plugged or repaired within 6 months of identifying integrity issue (8/12/2025). Pressure is to be managed and mitigated until plugging or repair is complete. 3. Shut in bradenhead pressure shall not exceed threshold pressure.
EngineerForm: (04 )
404141219
4/1/2025
1) For applicable operations, report work completed within 30 days on a Form 4 Sundry REPORT OF WORK DONE - Repair Well noting final pressure test results and include any operational or job summaries. If the wellbore geometry changes or there is not an updated WBD in the well file submit an updated WBD. 2) For applicable operations, submit a Form 5 or 5A (updated packer and tubing depths) within 30 days of the work with job related documents including a minimum of one of the following attachments: operations summary, cement job summary and/or wireline summary. Additionally, include CBL’s and any additional logs run. 3) Provide electronic Form 42 Notice of MIRU 2 business days ahead of operations 5) Operator shall notify ECMC Engineering staff prior to pumping cement or if changes to the approved repair procedure are required. 6) Complete a pressure test to verify repairs. Submit documentation of pressure test on the applicable post work ECMC form. 7) Well to plugged or repaired no later than 8/12/2025. Pressure is to be managed and mitigated until plugging is complete
EngineerForm: (04 )
404296363
7/29/2025
If BH and production pressures equalize within 10 psi, contact ECMC engineering
 