| Engineer | Form: (04) 403194688 11/16/2022 | 1) Operator shall comply with COGCC Rule 419. Bradenhead Monitoring, Testing, and Reporting and Rule 420. Form 17, Bradenhead Test Report
2) At least once a year shut in bradenhead for 7 days or until the pressure reaches the bradenhead threshold and perform a bradenhead test. Report results on a Form 17, as specified in Rule 420 or other Director approved submittal method.
3) Within 30 days of completing the work, submit a Form 4 Subsequent Report - Bradenhead Plan
4) Complete installation of BH monitoring system by 3/31/2023
5) Perform diagnostics on the high Intermediate pressure and report results on Sundry required by COA#3 |
| Engineer | Form: (04) 404507486 02/03/2026 | Intermediate Tie in COAs
1. Operator will implement measures to control venting, to protect health and safety, and to ensure that vapors and odors from well operations do not constitute a nuisance or hazard to public welfare.
2. Intermediate gas is not to be vented to atmosphere; any gas from the Intermediate will be routed to the specified abatement system. Operator will implement measures to get an initial estimate of the gas flow rate and/or volume from the intermediate. The abatement program may be used for six consecutive months.
3. Operator will submit a Form 42 (“OTHER”) stating that “bradenhead abatement program has started.”
4. At the conclusion of the six months (from installation of pressure mitigation system), conduct a new bradenhead test and submit the Form 17 within ten days of the test and submit a Form 4 Sundry that summarizes current well condition. The sundry should include details of the future plans, flow rate information, pressure data and a discussion of the sample analysis.
5. At least one check valve is required for annular spaces that are tied to sales line or separator. Maintain equipment for pressure regulation and check valves in good working order.
6. At least one valve is required to monitor pressure and sample flow from the intermediate.
7. Within 30 days of completing the work, submit a Form 4 Subsequent Report including a schematic of the intermediate tie in
|