Engineer | Form: (04 ) 401521556 3/22/2018 | This approval is good for one year and a new application must be made before January 22, 2019(1 year from prior application). Updates for the planned utilization of the well should be included with the application.
A Form 5A is required to report all plugs currently downhole which isolate the perforated interval. |
Engineer | Form: (04 ) 401192252 3/22/2018 | This approval is good for one year and a new application must be made before January 24, 2018(1 year from prior application). Updates for the planned utilization of the well should be included with the application.
A Form 5A is required to report all plugs currently downhole which isolate the perforated interval. |
Engineer | Form: (04 ) 401735921 8/17/2018 | This approval is good for one year and a new application must be made before January 22, 2019(1 year from prior application). Updates for the planned utilization of the well should be included with the application. |
UIC | Form: (04 ) 401740530 8/22/2018 | As noted in Step 10 well must pass a witnessed MIT in order to qualify for TA Status. Work must be completed by October 6, 2018 (6 months from Failed MIT on 4/6/2018). |
Engineer | Form: (04 ) 401881242 2/27/2019 | This approval is good for one year and a new application must be made before 1 year from prior application. Updates for the planned utilization of the well should be included with the application. |
Engineer | Form: (04 ) 402269617 3/26/2020 | 1) This approval is good for one year and a new application must be made before 1/9/2021 (1 year from prior application). Updates for the planned utilization of the well should be included with the application.
2) The Form 7 reporting must reflect the well status dates reported on the Form 4-TA request.
3) A Form 5A is required to report all plugs currently downhole which isolate the perforated interval.
|
Engineer | Form: (04 ) 402551573 4/19/2021 | 1) This approval is good for one year and a new application must be made before 01/09/2022 (1 year from prior application). Updates for the planned utilization of the well should be included with the application.
2) The Form 7 reporting must reflect the well status dates reported on the Form 4-TA request.
|
Engineer | Form: (04 ) 402904935 1/25/2022 | 1) This approval is good for one year and a new application must be made before 01/09/2023 (1 year from prior application). Updates for the planned utilization of the well should be included with the application.
2) The Form 7 reporting must reflect the well status dates reported on the Form 4-TA request. Correct production reporting from SI to TA for all applicable months.
|