Engineer | Form: (04 ) 401513613 3/13/2018 | This approval is good for one year and a new application must be made before January 15, 2019(1 year from prior application). Updates for the planned utilization of the well should be included with the application.
A Form 5A is required to report all plugs currently downhole which isolate the perforated interval.
Form 7 reporting must reflect the well status dates reported on the TA request.
|
Engineer | Form: (04 ) 401186761 3/13/2018 | This approval is good for one year and a new application must be made before January 17, 2018(1 year from prior application). Updates for the planned utilization of the well should be included with the application.
A Form 5A is required to report all plugs currently downhole which isolate the perforated interval.
Form 7 reporting must reflect the well status dates reported on the TA request.
|
Engineer | Form: (04 ) 401701262 7/23/2018 | This approval is good for one year and a new application must be made before July 12, 2017(1 year from prior application). Updates for the planned utilization of the well should be included with the application.
The Form 7 reporting must reflect the well status dates reported on the Form 4-TA request.
|
Engineer | Form: (04 ) 401870471 4/16/2019 | This approval is good for one year and a new application must be made before July 12, 2020(1 year from prior application). Updates for the planned utilization of the well should be included with the application.
|
Engineer | Form: (04 ) 402269680 3/31/2020 | 1)This approval is good for one year and a new application must be made before 1/09/2021 (1 year from prior application). Updates for the planned utilization of the well should be included with the application.
2)The Form 7 reporting must reflect the well status dates reported on the Form 4-TA request.
3)A Form 5A is required to report all plugs currently downhole which isolate the perforated interval.
|
Engineer | Form: (04 ) 402561620 1/19/2021 | 1) This approval is good for one year and a new application must be made before 01/09/2022 (1 year from prior application). Updates for the planned utilization of the well should be included with the application.
2) The Form 7 reporting must reflect the well status dates reported on the Form 4-TA request.
|
Engineer | Form: (04 ) 402910154 2/9/2022 | 1) This approval is good for one year and a new application must be made before 01/09/2023 (1 year from prior application). Updates for the planned utilization of the well should be included with the application.
2) The Form 7 reporting must reflect the well status dates reported on the Form 4-TA request. Please update production reporting status of all applicable months from SI to TA for 8/2000 forward.
3) Submit a current Wellbore Diagram on a Form 4 Sundry
|