Engineer | Form: (04 ) 402124586 12/18/2019 | 1)This approval is good for one year and a new application must be made before 7/29/19 (1 year from prior application). Updates for the planned utilization of the well should be included with the application.
2) A Form 5A is required to report all plugs currently downhole which isolate the perforated interval. |