Engineer | Form: (06 ) 400403231 4/17/2013 | trying to interpret data, seems well has already been partly or mostly P&A'd.
80 sacks (15.8 ppg) put in 9/8/2012 -- TOC inside casing @ 2066' (down to 2286')
l emailed opr rep re: WBD (and MIT?) requested by D Andrews (see Sept 2012 correspondence in wellfiles)
added perf-&-squeeze cementing step 50' below surface shoe; and sufficient cement at surface for at least 50' plug |