WELL05-103-08104EMERALD
72X
SCOUT ENERGY MANAGEMENT LLC
10779
AC
6/1/2023
RANGELY
72370
RIO BLANCO  103
SWNW 30 2N102W 6
315224View Related
 
COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
EngineerForm: (04 )
401189012
3/22/2018
This approval is good for one year and a new application must be made before January 19, 2018(1 year from prior application). Updates for the planned utilization of the well should be included with the application. A Form 5A is required to report all plugs currently downhole which isolate the perforated interval. The Form 7 reporting must reflect the well status dates reported on the TA request.
EngineerForm: (04 )
401521406
3/22/2018
This approval is good for one year and a new application must be made before January 22, 2019(1 year from prior application). Updates for the planned utilization of the well should be included with the application. A Form 5A is required to report all plugs currently downhole which isolate the perforated interval. The Form 7 reporting must reflect the well status dates reported on the TA request.
EngineerForm: (04 )
401734733
8/17/2018
This approval is good for one year and a new application must be made before January 22, 2019(1 year from prior application). Updates for the planned utilization of the well should be included with the application.
EngineerForm: (04 )
401880397
2/28/2019
This approval is good for one year and a new application must be made before January 10, 2020 (1 year from prior application). Updates for the planned utilization of the well should be included with the application.
UICForm: (02 )
401756721
6/25/2019
1. Injection is not authorized until approval of Subsequent Forms 31 and 33. 2. Retrieve water sample(s) from injection zone(s) before stimulating formation. Samples must be analyzed for Total Dissolved Solids at a minimum. 3. PRIOR TO PERFORMING OPERATIONS: Operator is required to contact COGCC to discuss acid and fracturing jobs. Approval of Form 4 may be required for acid and fracturing jobs. (As of 4/13/2016) 4. PRIOR TO PERFORMING OPERATIONS: Operator is required to contact COGCC to discuss Step Rate Test or Injectivity Test criteria for Maximum Surface Injection Pressure determination. Prior approval of Form 4 may be required for step rate and injectivity tests. 5. For all converted Underground Injection Control wells a Cement Bond Log (CBL) is required on the cased portions of the hole from the bottom of the casing to the top of the next shallower casing string for all casing strings other than the Surface Casing. Only a PDF, TIFF, or PDS visual image is required. 6. Operator must provide all tops of formations encountered from surface to TD on the Form 5 when submitted. 7. Well must pass MIT witnessed by COGCC before Subsequent Forms 31 and 33 will be approved. Well in must be in injection configuration.
UICForm: (05A )
401734723
6/25/2019
Well passed MIT on 3/14/2018. Doc # 401576409.
Final ReviewForm: (02 )
401756721
7/12/2019
If this conversion to injection results in additional surface disturbance, a Form 2A is required prior to commencement of operations with heavy equipment. If this conversion to injection requires additional aboveground production facilities within the boundaries of the existin oil and gas location, a Form 2A describing the location shall be submitted within 60 days of approval of this APD.
EngineerForm: (04 )
402263888
3/24/2020
1) This approval is good for one year and a new application must be made before 1/9/2021 (1 year from prior application). Updates for the planned utilization of the well should be included with the application. 2) The Form 7 reporting must reflect the well status dates reported on the Form 4-TA request. 3) A Form 5A is required to report all plugs currently downhole which isolate the perforated interval.
EngineerForm: (04 )
402551433
4/15/2021
1) This approval is good for one year and a new application must be made before 01/09/2022 (1 year from prior application). Updates for the planned utilization of the well should be included with the application. 2) The Form 7 reporting must reflect the well status dates reported on the Form 4-TA request.
EngineerForm: (04 )
402904913
1/24/2022
1) This approval is good for one year and a new application must be made before 01/09/2023 (1 year from prior application). Updates for the planned utilization of the well should be included with the application. 2) The Form 7 reporting must reflect the well status dates reported on the Form 4-TA request. Correct production reporting from SI to TA for 9/1998 to 6/2010
 
COGIS - Best Management Practice Results
No records to display.