Skip to Main Content

COGIS DB

 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation IDRelated Facilities
WELL05-103-07942FEDERAL
12-6
SCOUT ENERGY MANAGEMENT LLC
10779
PR
4/1/2024
RANGELY
72370
RIO BLANCO  103
NWSW 6 1N101W 6
315117View Related
 
COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
EngineerForm: (04 )
402594373
5/4/2021
1. Flaring is approved until January 15, 2022 or the CDPHE allowed quantity of gas is exceeded. Flaring of natural gas shall comply with COGCC Rule 903. 2. The unnecessary or excessive venting or flaring of produced natural gas is prohibited. 3. Operator is to provide prior notification to the local emergency dispatch or the local governmental designee of any flaring or venting event. 4. An Operator Monthly Report of Operations, Form 7, requires the reporting of flared, vented or used on the lease gas volumes. The reported volume includes flowback and production gas. 5. The operator is required to obtain and maintain any required air permits from CDPHE. 6. If flaring is requested after Jan 15, 2022, submit a gas capture plan via a Form 4. The Operator may not Flare or Vent pursuant to Rule 903.d.(3) unless and until the Director approves the Form 4.
EngineerForm: (04 )
403564203
10/24/2023
1) Submit results of 10/10/23 bradenhead test on a Form 17 and include an updated WBD 2) Return the well to production or complete a Form 21 MIT by 12/31/2024
EngineerForm: (04 )
403322764
11/14/2023
1) Operator shall comply with COGCC Rule 419. Bradenhead Monitoring, Testing, and Reporting and Rule 420. Form 17, Bradenhead Test Report or other Director approved submittal method. 2) Comply with any CDPHE, Air Pollution Control Division rules or requirements for all atmospheric discharges. 5) At least one valve is required to monitor pressure and sample flow from the bradenhead. 6) Within 30 days of completing the work, submit a Form 4 Subsequent Report - Bradenhead Plan 7) Submit required forms and documentation to register new flowlines 8) Submit a Form 4 for any venting during maintenance activities if it exceeds 8 hours 9) Submit a new sundry with an updated Gas Capture Plan if there are significant changes to wellbore conditions or the gas take away system
OGLAForm: (04 )
403322764
8/5/2024
Operator will submit the annual gas analysis for the Federal 12-6 location, not the Hill Central Tank Battery, via F4 Sundry within 60 days of approval of this Form 4 Sundry.
 
COGIS - Best Management Practice Results
No records to display.