Skip to Main Content

COGIS DB

 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation IDRelated Facilities
WELL05-103-07731EMERALD
171
SCOUT ENERGY MANAGEMENT LLC
10779
PA
11/10/1976
RANGELY
72370
RIO BLANCO  103
SWNE 26 2N103W 6
397673View Related
 
COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
EngineerForm: (06 )
401963428
3/22/2019
1)Provide 48 hour notice of plugging MIRU via electronic Form 42. 2)Properly abandon flowlines as per Rule 1105. File electronic Form 42 once abandonment complete. Within 30 days of an operator completing abandonment requirements for an off-location flowline or crude oil transfer line the operator shall submit a Flowline Report, Form 44. 3)Operator shall implement measures to control unnecessary and excessive venting, to protect the health and safety of the public, and to ensure that vapors and odors from well plugging operations do not constitute a nuisance or hazard to public welfare. 4)Visually confirm returns to surface in 4.5" production casing as well as annulus between the 4.5" production casing and the 7" surface casing.
 
COGIS - Best Management Practice Results