Skip to Main Content

COGIS DB

 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation IDRelated Facilities
WELL05-103-07647FEE
95X
SCOUT ENERGY MANAGEMENT LLC
10779
PR
11/4/1974
RANGELY
72370
RIO BLANCO  103
NESE 30 2N102W 6
314964View Related
 
COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
EngineerForm: (04)
402436482
07/06/2020
1)At least once a year shut in bradenhead for 7 days and perform a bradenhead test if pressure builds to 150 psi. Report results on operator’s annual spreadsheet and on a Form 17 if bradenhead test was performed. 2)Comply with any CDPHE, Air Pollution Control Division rules or requirements for all atmospheric discharges. 3)Any liquids blown down are to be collected, stored, handled, and treated or disposed as E&P waste per COGCC’s 900 series rules. 4)At least one check valve is required for annular spaces that are tied to sales. Maintain equipment for pressure regulation and check valves in good working order.
EngineerForm: (04)
404425950
12/11/2025
1. Operator will implement measures to control venting, to protect health and safety, and to ensure that vapors and odors from well operations do not constitute a nuisance or hazard to public welfare. 2. No later than 10/20/26, conduct a bradenhead test, submit a Form 17, and submit a Form 4 Sundry that summarizes current well condition. The well should be shut in for seven days to monitor and collect data to characterize build up pressures prior to conducting the bradenhead test. The sundry should include details of the future plans, sample analysis interpretation, bradenhead test description, and the flow rate information and pressure data. 3. Operator will implement measures to get an estimate of the gas flow rate and/or volume from the bradenhead. During the shut-in period record pressure data to adequately characterize the build-up.
 
COGIS - Best Management Practice Results
No records to display.