Engineer | Form: (04 ) 401188719 3/22/2018 | This approval is good for one year and a new application must be made before January 19, 2018(1 year from prior application). Updates for the planned utilization of the well should be included with the application.
A Form 5A is required to report all plugs currently downhole which isolate the perforated interval. |
Engineer | Form: (04 ) 401517097 3/22/2018 | This approval is good for one year and a new application must be made before January 17, 2019(1 year from prior application). Updates for the planned utilization of the well should be included with the application.
A Form 5A is required to report all plugs currently downhole which isolate the perforated interval. |
Engineer | Form: (04 ) 401722414 8/6/2018 | This approval is good for one year and a new application must be made before January 17, 2019(1 year from prior application). Updates for the planned utilization of the well should be included with the application.
|
Engineer | Form: (04 ) 401878850 4/23/2019 | This approval is good for one year and a new application must be made before January 17, 2020(1 year from prior application). Updates for the planned utilization of the well should be included with the application. |
Engineer | Form: (04 ) 402269640 3/30/2020 | 1) This approval is good for one year and a new application must be made before 1/09/2021 (1 year from prior application). Updates for the planned utilization of the well should be included with the application.
2) The Form 7 reporting must reflect the well status dates reported on the Form 4-TA request.
3) A Form 5A is required to report all plugs currently downhole which isolate the perforated interval.
|
Engineer | Form: (04 ) 402551318 4/12/2021 | 1) This approval is good for one year and a new application must be made before 01/09/2022 (1 year from prior application). Updates for the planned utilization of the well should be included with the application.
2) The Form 7 reporting must reflect the well status dates reported on the Form 4-TA request.
|
Engineer | Form: (04 ) 402904612 1/11/2022 | 1) This approval is good for one year and a new application must be made before 01/09/2023 (1 year from prior application). Updates for the planned utilization of the well should be included with the application.
2) The Form 7 reporting must reflect the well status dates reported on the Form 4-TA request.
|