Skip to Main Content

COGIS DB

 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation IDRelated Facilities
WELL05-103-06202LARSON, F V
B-2
SCOUT ENERGY MANAGEMENT LLC
10779
AC
5/1/2023
RANGELY
72370
RIO BLANCO  103
SESE 26 2N102W 6
314606View Related
 
COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
EngineerForm: (04 )
401193488
3/21/2018
This approval is good for one year and a new application must be made before January 25, 2018(1 year from prior application). Updates for the planned utilization of the well should be included with the application. A Form 5A is required to report all plugs currently downhole which isolate the perforated interval.
EngineerForm: (04 )
401514200
3/21/2018
This approval is good for one year and a new application must be made before January 16, 2019(1 year from prior application). Updates for the planned utilization of the well should be included with the application. A Form 5A is required to report all plugs currently downhole which isolate the perforated interval.
EngineerForm: (04 )
401715777
8/17/2018
This approval is good for one year and a new application must be made before January 16, 2019(1 year from prior application). Updates for the planned utilization of the well should be included with the application.
EngineerForm: (04 )
401879448
4/23/2019
This approval is good for one year and a new application must be made before January 16, 2020(1 year from prior application). Updates for the planned utilization of the well should be included with the application.
EngineerForm: (04 )
402269648
3/30/2020
1) This approval is good for one year and a new application must be made before 1/09/2021 (1 year from prior application). Updates for the planned utilization of the well should be included with the application. 2) The Form 7 reporting must reflect the well status dates reported on the Form 4-TA request. 3) A Form 5A is required to report all plugs currently downhole which isolate the perforated interval.
EngineerForm: (04 )
402551714
4/27/2021
1) This approval is good for one year and a new application must be made before 01/09/2022 (1 year from prior application). Updates for the planned utilization of the well should be included with the application. 2) The Form 7 reporting must reflect the well status dates reported on the Form 4-TA request.
EngineerForm: (04 )
402909297
2/3/2022
Annual Bradenhead test completed There is no current WBD on file. Please submit an updated WBD. See COA#3 Corrected TA date to 12/22/1999 per historical documentation. Please update internal records for correct TA date. See COA#2 to correct production reporting.
UICForm: (04 )
403220892
4/4/2023
Updated well classification to Observation Well. Used 11/07/2022 as date well is no longer an injector. Operator to report this well as AC (Active) on Form 7.
 
COGIS - Best Management Practice Results
No records to display.