Engineer | Form: (04 ) 401517895 3/22/2018 | This approval is good for one year and a new application must be made before January 18, 2019(1 year from prior application). Updates for the planned utilization of the well should be included with the application.
A Form 5A is required to report all plugs currently downhole which isolate the perforated interval.
The Form 7 reporting must reflect the well status dates reported on the TA request. |
Engineer | Form: (04 ) 401734306 8/17/2018 | This approval is good for one year and a new application must be made before January 18, 2019(1 year from prior application). Updates for the planned utilization of the well should be included with the application. |
Engineer | Form: (04 ) 401879841 2/28/2019 | This approval is good for one year and a new application must be made before January 10, 2020 (1 year from prior application). Updates for the planned utilization of the well should be included with the application. |
Engineer | Form: (04 ) 402269644 3/30/2020 | 1) This approval is good for one year and a new application must be made before 1/09/2021 (1 year from prior application). Updates for the planned utilization of the well should be included with the application.
2) The Form 7 reporting must reflect the well status dates reported on the Form 4-TA request.
3) A Form 5A is required to report all plugs currently downhole which isolate the perforated interval.
|
Engineer | Form: (04 ) 402562428 1/11/2021 | 1) This approval is good for one year and a new application must be made before 1/9/2022 (1 year from prior application). Updates for the planned utilization of the well should be included with the application.
2) The Form 7 reporting must reflect the well status dates reported on the Form 4-TA request.
3) A Form 5A is required to report all plugs currently downhole which isolate the perforated interval.
4) Complete Form 21 MIT by 9/13/2021 |
Engineer | Form: (04 ) 402904826 1/13/2022 | 1) This approval is good for one year and a new application must be made before 01/09/2023 (1 year from prior application). Updates for the planned utilization of the well should be included with the application.
2) The Form 7 reporting must reflect the well status dates reported on the Form 4-TA request.
3) Submit a Wellbore Diagram on a Form 4 Sundry
|