Engineer | Form: (04 ) 402704993 6/21/2021 | 1) This sundry to conduct bradenhead diagnostic evaluations is valid until 6/1/2022
2) For Wells that have sustained casing pressure above the action threshold as determined through diagnostic testing and evaluation, the Operator will provide a PMP with the Form 4, including a description of the Operator’s findings from the previous year, number of times the well was blown down, a current WBD and future plans for more frequent monitoring or testing, pressure mitigation, or remedial well work by 6/1/2022
3) Submit the gas sample analysis from previous Form 17 bradenhead test on a Form 43
4) Comply with any CDPHE, Air Pollution Control Division rules or requirements for all atmospheric discharges.
|