Engineer | Form: (04 ) 402706763 6/14/2021 | 1) Complete well repair and MIT by 12/2/2021
2) Following well repair, complete a Form 17 bradenhead test
3) If sustained bradenhead pressure is observed following well repairs submit a Form 4 Pressure Management Plan |
Engineer | Form: (04 ) 402771756 8/17/2021 | 1) Report work completed with a Form 4 Sundry REPORT OF WORK DONE - Repair Well noting final pressure test results.
2) If wellbore geometry changes or cement work is executed, submit information on a Form 5.
3) If a casing leak is identified, contact area engineer with repair plans.
4) Complete a Form 21 MIT to verify repairs for injection wells.
|