Site Specific | Form: (02 ) 400332475 10/31/2012 | Chevron is using an existing wellbore. A workover rig will be used to plugback and drill out the side track, the workover rig can use a smaller well pad. No new access road will be needed.
|
Planning | Form: (02 ) 400332475 10/31/2012 | Chevron trains all employees in safe work practices, good environmental stewardship, health and wellness issues and to ensure that proper personal protective equipment is available and is being used. Chevron has an up to date Spill Protection Control and Countermeasure Plan for the Rangely field. |